• [list:title]
  • [list:title]
  • [list:title]

KY series tunnel drill features

ZUANJI SUMMARY

Drilling machine
Mine full hydraulic tunnel drill metal mine rock core drilling rig

Inner Mongolia Yinggong Equipment Machinery Factory mainly produces KY-100, KY-150, KY-200, KY-250, KY-300, KY-400, KY-500, KY-600 tunnel drilling RIGS. K- means drilling in the pit Y- means hydraulically operated mechanical transmission "Number" - is the drilling depth (m)


The deep prospecting design is based on the characteristics of the known ore body extending deep to the principle of ore prospecting. The purpose is to expand the known results, find the blind ore body, obtain the basic reserves, and provide the design basis for the deep exploration of the mine. Due to the low efficiency of pit exploration, slow speed, high cost, poor flexibility, low safety, and high labor intensity, the design is based on the principle of mine prospecting. As well as exploring in soft ore bodies and prematurely destroying the stability of ore bodies, drilling is an important means to obtain the best geological results, reduce the risk of mining, improve production efficiency and economic benefits.。

a、Small size, light weight, easy to install。 b、The rig is composed of three parts, main engine, pump station and operation station。 c、The original transportation and prospecting roadway can be put into production, which plays a role in protecting the overall structure of the mine. It can also be used for surface drilling 0-90 degrees。 d、Drill rig layout is flexible, mechanized twist off drill pipe, reduce the labor intensity of workers, improve work efficiency。 e、The use of box-type feed frame, clamp tightening, power head rotary drilling, oil cylinder pulling drilling tools, can save the cumbersome tower。 f、With linkage function, centralized control through the operation table, simple and safe, can be stepless speed regulation。 j、Hollow shaft design, the length of the drill pipe is not limited by the drilling machine. It can be drilled at any Angle of 360°。 h、Good disintegrability, convenient relocation and transportation. Φ33-Φ43/φ43-φ55.5-φ71 drill pipe can be used in the same machine, and it takes only 15 minutes to replace。 i、Oil pump, water pump, power supply centralized operating platform。 j、Pull out column, suitable for high and low roadway。 k、The material of the drill pipe is wear-resistant than the material of the drill pipe, which can play the role of a support point, reduce the friction of the drill pipe and increase the life of the drill pipe。 l、Imported oil gauge line, withstand high pressure, soft, reduce high pressure oil pulse force, make the hydraulic oil gauge pointer more stable, can timely find the hole layer, rock changes。 m、Special customized oil temperature cooler, high pressure oil cooling fast, low temperature use, can protect the motor, oil pump, rubber seal life。

Full hydraulic tunnel drill picture display

STRUCTURE

Drill construction principle

PRINCIPLE

Tunnel drill
Full hydraulic tunnel core drilling rig

Construction principle

The deep prospecting design is based on the characteristics of the known ore body extending deep to the principle of ore prospecting. The purpose is to expand the known results, find the blind ore body, obtain the basic reserves, and provide the design basis for the deep exploration of the mine. Due to the low efficiency of pit exploration, slow speed, high cost, poor flexibility, low safety, and high labor intensity, the design is based on the principle of mine prospecting. In addition, the stability of ore body is destroyed by prospecting in soft ore body too early. Drilling is an important means to obtain the best geological results, reduce the risk of mining, and improve production efficiency and economic benefits。

<

Rig News

How much is a full hydraulic tunnel drill?

Full hydraulic tunnel drill video case

STRUCTURE